Global Projects in Peninsular Malaysia

YJACK360 Bi-Directional Pile Load Test

Mobirise Website Builder
Project: Country Garden Forest City, Johor Bahru

The Forest City mega-project in Johor, Malaysia, known for its extensive and demanding Bi-Directional Pile Load Testing requirements, has decided to enhance its project efficiency by opting for YJACK360. This innovative solution is expected to streamline the testing process, providing accurate and reliable data to support the project's ambitious infrastructure goals.

Mobirise Website Builder
Project: Klang Valley Mass Rapid Transit, Kuala Lumpur

The Klang Valley Mass Rapid Transit project in Kuala Lumpur, renowned for its extensive and challenging Bi-Directional Pile Load Testing requirements, has chosen to enhance its project efficiency by utilizing YJACK360. This cutting-edge solution is anticipated to streamline the testing process, delivering precise and reliable data to support the project's ambitious infrastructure objectives.

Mobirise Website Builder
Project: East Coast Railway Link,
Malaysia

The East Coast Rail Link (ECRL) project in Malaysia, recognized for its extensive and rigorous Bi-Directional Pile Load Testing needs, has opted to improve project efficiency through the adoption of YJACK360. This advanced solution is poised to optimize the testing process, providing accurate and dependable data crucial for achieving the project's ambitious infrastructure targets

OJACK360 Bi-Directional Pile Load Test

Mobirise Website Builder
Project: LSH Sentul Condominium,
Kuala Lumpur

An OJACK360 Bi-Directional Pile Load Test was performed in Kuala Lumpur on a 1050mm diameter bored pile, nearly 20 meters long. The work load was 1004 tons, with a test load of 2008 tons, and a failure load of 2510 tons. The pile was instrumented with five levels of vibration wire strain gauges (VWSGs).

Mobirise Website Builder
Project: Bridge Project in Muar–Segamat,
Johor

The OJACK360 Bi-Directional Pile Load Test was conducted in Muar, Johor, on a spun concrete pile with a diameter of 450mm and a length of nearly 30 meters. The work load for the test was set at 120 tons, while the test load reached 240 tons.

Mobirise Website Builder
Project: LSH Sentul Condominium,
Kuala Lumpur

In Kuala Lumpur, an OJACK360 Bi-Directional Pile Load Test was conducted on a bored pile with a diameter of 1350mm and a length of nearly 20 meters. The test was designed to assess the pile's performance under significant loads. The pile was subjected to a work load of 1696 tons and a test load of 3392 tons, ensuring thorough evaluation of its load-bearing capacity and structural integrity.